Chinese translation for "pile material"
|
- 反应堆材料
制桩材料
Related Translations:
piling: n.1.打桩,打桩工程。2.桩,桩基;桩材。
- Example Sentences:
| 1. | According to the application of plc in finishing the piled material of plate production line , the outer outlet , work process and software design are introduced 针对plc在完成板材生产线堆料环节的应用,介绍了该系统的外部接线、工作流程及软件设计。 | | 2. | 3 . based on the above solutions , the influences of soil parameters in different visco - elastic model and viscosity of pile material on vibration characteristics and time domain response of pile are analyzed in detail 3 、基于所得解,详细分析了各种模型下有关土工参数对桩的振动特性及时域响应曲线的影响规律,并研究了桩材料阻尼及土层性质差异等的影响。 | | 3. | The 3d model of soil pile superstructure interaction system was established by using finite element method , and the interface element was used to model the interface behavior between soil and pile materials 本文针对地震作用下桥梁桩基础的接触面效应及其对结构地震反应的影响问题,以某桥梁工程为背景,通过在桩土交界面处设置接触单元来模拟桩土间的接触非线性,建立了土桩桥梁结构相互作用体系的三维分析模型。 | | 4. | With the retrospection of the developing course of the bored pile foundation and combining with my practical experience , the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target , and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics , empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation , such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile , which provides the generalization and application with base materials , expounds its feasibilities , adaptabilities and economy 本文通过综合分析国内外钻孔桩基础的发展历程及研究现状,重点讨论了填石压浆混凝土空心桩、预制预应力混凝土空心桩的成桩工艺、填石压浆混凝土的配合比设计原理及影响强度指标的主要因素;根据泥浆水力学原理,导得了考虑各种因素的水泥浆液在预填骨料中的流动影响半径和上升高度;结合河南省洛阳伊河大桥、党湾涧河大桥工程实践,讨论了填石压浆混凝土空心桩基础的质量检测方法及标准;并在此基础上,深入分析了桩侧、桩端承载能力,提出了填石压浆混凝土空心桩的设计计算理论和方法。最后,论证了空心桩新工艺的可行性、适应性、经济性,为大力推广应用空心桩新技术提供了可靠的技术资料。 | | 5. | The lecture concerns songshan concrete face rockfill dam , which is calculated by shen zhujiang model of rock - piled materials . we applied finite element method ( fem ) to analysis songshan concrete face rockfill dam in case of steep slope so as to get the relation between strain and stress and deformation rules . we can draw some useful conclusions from them 本文以松山混凝土面板堆石坝为背景,采用堆石体材料的沈珠江模型,应用有限元方法分析了高陡边坡情况松山面板堆石坝的应力-应变关系和变形规律,得到了一些有益的结论。 | | 6. | Through a lot of test pile material , this essay concludes the vertical bearing capacity calculation formula of man - made pile with bulb shaped base by strength theory and relative deformation as control criterion . the method of defining pedestal pile foundation deformation modulus is especially discussed in this article , and it takes the mindlin solution as the starting point using mathematics method to get the poisson ' s ratio ( u ) which is the factor influencing foundation soil deformation modulus , and a deformation modulus calculating equation is finally determined 本文通过大量试桩资料和有限元计算分析,给出了以强度理论和相对变形为控制标准的人工挖孔扩底桩竖向承载力计算公式。其中特别论述了扩底桩地基变形模量的确定方法,并从mindlin解出发利用数学方法得出了影响地基土变形模量大小的因素?泊松比,初步确定了比较完善的变形模量计算公式。 | | 7. | The dump vehicle is suit to load and disoharge the piled material , such as the loose soil , finc sand , fertilizsr , waste . so it can be wildly used in many fields , such as construction site , iuad maintenance , municipsl works , railroad consiruction , dock transport , brickfield , and carry in warehouse , it can be used in many cngineering construction , stch as water conservancy project , onvirenment engineering and gardens . it is the ideal shourt haul means within 1 km 该产品适用于装卸松土、细砂、肥料、垃圾、水泥等成堆堆放的物料,因此是广泛用于建筑施工、公路养护、市政工程、铁路建设、码头运输、窖厂作业、仓库搬运以及水利、环卫、园林等工程建设,是运输半径为1km以内理想的短途运输工具。 | | 8. | Nonlinear characteristic of pile material can not be reflected well by the beam element , and bending deformation of pile can not be reflected by the standard solid element , so the eas - element are recommended . the calculation results also prove that the eas element is appropriate for modeling pile 鉴于梁单元不能较好反映桩体材料的非线性特性,而常规等参单元不能较好地反映桩体的弯曲变形等缺点,引入了强化假定应变等参单元,并通过算例验证了该单元描述桩的合理性。 | | 9. | In this dissertation , on the basis of the existing work , the longitudinal vibration theory and the relevant properties of pile with defects and variation modulus in layered soils is studied , in which viscosity of pile material is considered and surrounding soils are simulated respectively with normal voigt model , normal maxwell model , general voigt model and general maxwell model 在总结前人研究成果的基础上,本文将桩侧土分别简化为标准voigt模型、标准maxwell模型、广义voigt模型、广义maxwell模型,并考虑桩自身材料阻尼,对成层土中变阻抗桩的纵向振动理论及其特性进行了研究。 |
- Similar Words:
- "pile load" Chinese translation, "pile load capacity" Chinese translation, "pile load test" Chinese translation, "pile loading test" Chinese translation, "pile location" Chinese translation, "pile monkey" Chinese translation, "pile mooring" Chinese translation, "pile moorings" Chinese translation, "pile nap" Chinese translation, "pile neutron" Chinese translation
|
|
|